Project Brief
Green Piling were sub-contracted to install precast concrete and steel tubular piles. The works took place over 27 weeks. The works including raking and tight access piling. Raking piles were fully welded and were subject to sonic integrity tests. Restricted piling was installed under overhead power cables and had to be driven in 2m sections and filled with concrete to accommodate tension & horizontal loads.
Key Requirements
- Duration: 27 weeks
- Rig: Junttan PM20
- Piling System: Precast Concrete & Steel Tubular Piles
- Ground Conditions: Made / Very Soft Alluvium / Overlying River Terrace Deposits / Chalk
- Number of Piles: 1230 Piles total
- Pile Loads: 500kN
- Pile Lengths: Up to 28m
- Testing Regime: Static Testing