A successful project, sub-contracted by National Grid.
Scope of works
Precast Concrete Piling
Steel Tubular Piling

Project Brief

Green Piling were sub-contracted to install precast concrete and steel tubular piles. The works took place over 27 weeks. The works including raking and tight access piling. Raking piles were fully welded and were subject to sonic integrity tests. Restricted piling was installed under overhead power cables and had to be driven in 2m sections and filled with concrete to accommodate tension & horizontal loads.

Key Requirements

Share this post