Manufacturing
- Focus on the quality and traceability of our products
- Over 1,000,000 linear metres of precast pile and foundation beams manufactured
- UKCA mark and CARES approved manufacturing process
Industry-leading manufacturing
Industry-leading facilities
Pre-Stressed pile manufacturing facility
Our purpose-built manufacturing facility uses the latest technology and techniques from Holland, allowing us to provide unique and bespoke ground beams and piles for your project. We manufacture 200mm and 250mm square pre-stressed piles, along with customised precast beams designed to work with various piling systems.
On-site concrete batching plant
For consistency, quality and reliability in every product, our facility is equipped with a concrete batching plant. This allows us to mix concrete on-site for pile and beam manufacturing for superior control over the final result.Â
Bespoke foundation packages
Custom-made pre-cast beams
We offer tailored manufacturing solutions, including the production of bespoke precast beams that can be used with our range of piling systems. In 2024, we introduced new moulds and equipment, expanding our capabilities and allowing us to meet unique project requirements effectively.
In-house design team
Continuous investment
Ongoing expansion
Accredited & controlled conditions
Manufacturing facility team
"Green Piling’s commitment to quality manufacturing ensures we deliver reliable, high-performance ground engineering solutions that meet the needs of our clients. We continuously invest in our facilities, processes and team to stay at the forefront of industry standards."
Adrian
Factory Manager
Overcome weather delays and reduce waste with G-sPan foundation piles and beam
The G-sPan Foundation Beam System is a reliable and sustainable alternative to traditional ground beams, designed to optimise performance and ensure on-time installation in any environment. Engineered by Green Piling, this innovative system reduces waste, lowers carbon emissions, and adapts to diverse site layouts. Seamlessly integrating with Green Piling’s techniques, G-sPan provides a modern, efficient solution that meets the demands of construction professionals aiming to minimise delays, improve sustainability, and achieve exceptional project outcomes.