Housing the people of Cardiff by developing apartment flats.
Scope of Works
Continuous Flight Auger Piling

Project Brief

In advance of the main piling we carried out a programme of trial bores and preliminary test piles, the results of which informed the design submission for the main works. The main works consisted over 430nr x 600mm diameter CFA piles (compression loads ranging 500KN to 2000KN [600KN tension / 100KN horizontal load] for 432nr apartments over two blocks. Other works including tower crane piles and additional load testing to working piles.

Key Requirements

Share this post

Talk to a foundation expert

Get in Touch today to learn more about how our team can support.

    Let’s build strong foundations together

      Project Brief

      In advance of the main piling we carried out a programme of trial bores and preliminary test piles, the results of which informed the design submission for the main works. The main works consisted over 430nr x 600mm diameter CFA piles (compression loads ranging 500KN to 2000KN [600KN tension / 100KN horizontal load] for 432nr apartments over two blocks. Other works including tower crane piles and additional load testing to working piles.

      Key Requirements