Green Piling at Port of Blyth
Our 59t Junttan Piling rig drove 508mm diameter steel tubular piles (which are predominantly re-claimed from oil and gas industry) working off a bespoke grillage to protect the weakened berth, whilst driving our piles through pre-formed openings.