The G-sPan Precast Ground Beam System is an engineered foundation system developed by Green Piling and manufactured to the highest standards by us, providing a superior alternative to traditional in-situ ground beams. With conventional methods, G-sPan is unaffected by elements such as weather conditions, ensuring reliable performance and on time installation in most environments.
This consistency not only boosts installation efficiency by Green Pilings robust installation teams but also reduces material waste, i.e. offsite disposal, but promoting a more sustainable construction approach. Additionally, G-sPan significantly lowers carbon emissions compared to concrete filled foundations, aligning with modern environmental objectives. Its design allows for individual beam lengths, offering exceptional flexibility to accommodate various plot layouts and drainage requirements. Overall, this system represents a breakthrough in foundation solutions, merging efficiency, sustainability, and adaptability to meet the needs of construction and developer projects.
The G-sPan system effectively integrates with all our piling techniques, offering a unified approach to foundation construction. This collaboration enhances coordination and alignment between pile installation and beam placement, ensuring robust structural integrity throughout the foundation assembly process.
In line with our dedication and passion to providing foundation solutions, we present the G-sPan system as a complete package. This integrated approach covers every phase of the project lifecycle, from design, to the setting out, practical manufacturing, and installation of both piles and beams. By unifying these services into a single offering, we simplify project management, improve communication, and reduce potential friction points, ultimately ensuring exceptional results for our clients.
Green Pilings G-sPan receives Feedback from Client
Green Piling worked closely with Wordsworth Properties Limited to design, supply and install the foundation beams at Balby, near Doncaster, South Yorkshire. Incorporating the manufacturing excellence of the Green Piling precast factory, Green Piling supplied the driven precast (pre-stressed) piles first, then the foundation beams to complete the package on behalf of our client, installed by our robust installation teams.
We approached our client to give us feedback and you can read the positive results below.
“The build solution offered by Green Piling suited the projects specific requirements perfectly. The driven pile and pre-cast ring beam system allowed the imported material, used to cap off the made ground below, to remain in place. This method simplified and de-risked the Earthworks Strategy and Material Management Plan considerably. It also resulted a cost saving, and a significant time reduction compared to strip footings.
Green Piling delivered an excellent service from the first meeting, and we will explore the use of their G-sPan system on all our future projects.”
Jonathan Bailey, Managing Director Wordsworth Properties
For more information or advice on your project contact Green Piling Foundation Manager Kris Hand on kris.hand@greenpiling.co.uk