Steel Tubular Piling

Green Piling's steel tubular piles utilise reclaimed steel tube primarily from the oil and gas industries.

Top driven with highly efficient modern accelerated hammers, high vertical and horizontal load capacities are achievable relative to the section sizes. Being of slender cross section and low displacement, piles can be driven in noise and vibration sensitive situations, where other pile types would not be suitable.

Driven in lengths up to 14m, the high strength of the steel section gives the advantage of being suited to aggressive and complex ground conditions containing cobbles and/or boulder obstructions, sloping rock head or contamination.

Piles are continuously driven using a threaded coupler joint, with off cuts used on subsequent piles, minimising wastage.

Trimming of the piles is generally undertaken by flame cutting without the risk of hand arm vibration.

Reclaimed steel tubular piling is a quality, fast and efficient form of piling, generating no spoil for costly disposal and eliminating potential programme delays from obstructions, curing times and safety hazards.

Download Steel Tubular Piling Information Sheet 

Download Steel Tubular Piling Case Study

 

 

 

 

  

Our Policies

Please see our policies section, where you can download Green Piling's policies and procedures.

Read our policies

Brochure Request

Please click here to request a copy of our latest brochure.

Request Brochure