Stem Centre, York University
Main Contractor:
JN Bentley
Engineer:
ARUP
Sector:
Public Sector
Value:
£15k
This project at York University was our first job using our new Soilmec SF50 CFA Rig.
CFA was chosen due to the close proximity of other buildings and the fact that the university would be occupied throughout installation of the piles. CFA offers a quieter installation solution, which is ideal in these conditions.
The piles were installed over a period of three days, which was on time and within budget.
| Total No. of Piles Installed | 24 |
| Length of Piles | Up to 13.5m |
| Max. Load | Up to 400kN |
| Diameter of Piles | 450mm |