Bathgate Sports Centre
Main Contractor:
Graham Construction
Engineer:
Curtins Consulting
Sector:
Commercial
Value:
£120k
Green Piling designed, supplied and installed reclaimed steel tubular piles for the piling works for West Lothian Council as part of the foundations for a new sports centre in Bathgate which is to incorporate a 25m pool, 10m teaching pool, changing facilities and new office accommodation.
Green Piling offered an alternative piling system than originally suggested due to the poor ground conditions; working closely with the engineer the alternative system was agreed and implemented. Green Piling were sub-contracted to Graham Construction for the contract.
| Total No. of Piles Installed | 294 |
| Length of Piles | Up to 15m |
| Max. Load | 500kN |
| Diameter of Piles | 170 and 240mm Steel Tubular Piles |